Woollahra Hotel

This has been a most successful collaboration, resulting in a building and interior fitout of very high construction quality being delivered within a tight time frame under difficult conditions.” – Jonathan Evans

Award

  • Winner – Refurbishment / Renovation | $2.5 million – $5 million
    (MBA Excellence in Construction Awards)

Project details:
This project included the construction of two new bars, a restaurant, outdoor terrace, commercial kitchen and back-of-house facilities, as well as renovations and alterations to existing bars.

The restaurant reconstruction required the installation of a 16-tonne prefabricated steel façade, precast concrete floor panels and new roof structure. The restaurant features a timber acoustically designed vaulted ceiling. The hotel remained in operation throughout the 18-month construction period. This was a challenging project.

+ project details